Checking The Burner Gasket And Burner Gauze Assembly - Viessmann VITODENS 200-W Installation And Service Instructions For Contractors

1.9 to 32 kw, wall mounted gas condensing boiler with 7 inch colour touchscreen, natural gas and lpg version
Table of Contents

Advertisement

Commissioning, inspection, maintenance

Checking the burner gasket and burner gauze assembly

A
Fig. 39
Check burner gauze assembly
gasket
for damage. Only remove and replace com-
G
ponents if they are damaged or worn.
Note
If replacing the burner gauze assembly, also replace
the gauze assembly gasket and the fixing screw.
1. Disconnect plug with ignition electrode leads from
ignition unit
A
.
2. Remove electrodes
B
3. Undo Torx screw
. Hold onto burner gauze
C
assembly
D
when undoing the screw.
4. Remove burner gauze assembly
and thermal insulation ring
for damage.
5. Install new burner gasket
installation position. Align the tab as per the dia-
gram.
54
C
B
, electrodes
and
D
B
.
with gasket
D
. Check components
F
. Observe correct
G
G
6. Insert thermal insulation ring
assembly
with gasket
D
installation position. Align the tab as per the dia-
gram.
7. Align the hole in burner gauze assembly
the burner door pin.
Secure burner gauze assembly
with Torx screw
Torque: 3.0 Nm.
8. Check thermal insulation ring
9. Fit electrodes
B
chapter.
Torque: 4.5 Nm.
E
D
E
F
and burner gauze
F
. Observe correct
E
D
and gasket
D
C
.
for firm seating.
F
. Check clearances, see following
with
E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2hfB2kf

Table of Contents