Routing Connecting Cables/Leads - Viessmann VITODENS 200-W Installation And Service Instructions For Contractors

1.9 to 32 kw, wall mounted gas condensing boiler with 7 inch colour touchscreen, natural gas and lpg version
Table of Contents

Advertisement

Installation sequence
Electrical connections

Routing connecting cables/leads

!
Please note
If closures or diaphragm grommets are dam-
aged, splashproofing is no longer ensured.
Never open or damage closures or unused dia-
phragm grommets on the underside of the appli-
ance. Seal cable entries with fitted diaphragm
grommets.
Fig. 23
Bundle cables using the supplied cable clips.
Route extra low voltage (ELV) leads < 42 V separately
from cables
42 V/230 V~.
>
Secure the cable clips on the underside using the sup-
plied screws.
Do not route cables over sharp edges.
!
Please note
If connecting cables/leads come into contact
with hot components, they will be damaged.
When routing and securing cables/leads on site,
ensure that the maximum permissible tempera-
tures for these cables/leads are not exceeded.
30
(cont.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2hfB2kf

Table of Contents