Commissioning the system with the commissioning assistant
!
Please note
Only commission the appliance with a fully filled
trap.
Check that the trap has been filled with water.
Commissioning assistant
1. Open the gas shut-off valve.
2.
If the appliance has not been switched on yet:
■
Turn on the ON/OFF switch.
The commissioning assistant starts automati-
cally.
■
If the appliance has already been switched on:
See chapter "Calling up the commissioning
assistant at a later point", page 41.
Commissioning, inspection, maintenance
3. Commission the heat generator and follow the
commissioning assistant. See the overview below.
Note
Depending on the type of heat generator, the
accessories connected and other settings, not all
menu points will be displayed.
Note
After the commissioning assistant has finished,
check that the actuators are connected and operat-
ing correctly. Start the actuator test.
37