Installation Checklist And Installer Details - Rinnai Arriva 752 Operation Manual

Hide thumbs Also See for Arriva 752:
Table of Contents

Advertisement

Installation checklist
The installer must complete the installation checklist below and make sure this
guide is left with you. They must also instruct you about the use and care of the
appliance, and ensure you understand the safety instructions.
Checklist
F Appliance positioned in a suitable location (clearances, mantels, surrounds etc.).
F Rinnai flue system installed and tested to ensure effective draw.
F Gas pressure checked and set according to the data plate.
F Burn media installed as per instructions.
F Appliance tested for correct operation and to ensure no gas leaks.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the every two years.
Installer details
Company name:
Installer name:
Address:
Phone:
Certificate of compliance number for installation:
Signed:
16 | Arriva 752 operation guide: 12219-C 03-20
Mobile:
Date:

Advertisement

Table of Contents
loading

Table of Contents