Installation Checklist - Rinnai Novo Operation Manual

Table of Contents

Advertisement

Installation checklist

The installer must complete the installation checklist below and make sure this
guide is left with you. They must also instruct you about the use and care of the
appliance, and ensure you understand the safety instructions.
Checklist
F Appliance positioned in a suitable location (clearances, mantels and surrounds).
F Correct aeration plate configuration based on flue length.
F Rinnai flue system installed and tested to ensure effective draw.
F Commissioned as per the commissioning instructions.
F Burn media installed as per instructions.
F Appliance tested for correct operation and to ensure no gas leaks. This includes running on the
high and low settings for over five minutes.
F Manual on/off button checked to ensure it is operational.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the heater every two years.
Installer details
Company name:
Installer name:
Address:
Phone:
Certificate of compliance number for installation:
Signed:
18 | Novo DV operation guide: 13747-A 01-22
Mobile:
Date:

Advertisement

Table of Contents
loading

Table of Contents