Figure 51 - Sample Printout (Schedule); Figure 52 - Sample Printout (Sales Order) - York YD Series Operation Manual

Optiview control center centrifugal liquid chillers
Table of Contents

Advertisement

SECTION 3 – PRINTERS
YORK SCHEDULE
CHILLER ID
3
© 1997 - 1999 YORK INTERNATIONAL CORPORATION
MON 29 MAR 1999
1 27 PM
SCHEDULE
STANDARD SCHEDULE
---------------------------------------------------------------------------------
SUN
START
=
OFF
MON
START
=
8:00 AM
TUE
START
=
8:00 AM
WED
START
=
8:00 AM
THU
START
=
8:00 AM
FRI
START
=
8:00 AM
SAT
START
=
OFF
EXCEPTION DAYS
---------------------------------------------------------------------------------
02 APR 1999
START
= OFF
13 APR 1999
START
= 8:00 AM

FIGURE 51 - SAMPLE PRINTOUT (SCHEDULE)

144
= OFF
STOP
=
OFF
STOP
=
5:00 PM
STOP
=
5:00 PM
STOP
=
5:00 PM
STOP
=
5:00 PM
STOP
=
5:00 PM
STOP
=
OFF
STOP
=
OFF
STOP
=
10:00 PM
YORK SALES ORDER
CHILLER ID
3
© 1997 - 1999 YORK INTERNATIONAL CORPORATION
MON 29 MAR 1999 1 28 PM
ORDER INFORMATION
---------------------------------------------------------------------------------
COMMISSIONING DATE
JOB NAME
JOB LOCATION
MODEL NUMBER
YORK ORDER NUMBER
PANEL SERIAL NUMBER
CHILLER SERIAL NUMBER
DESIGN LOAD - CONDENSER
---------------------------------------------------------------------------------
PASSES
DESIGN WORKING PRESSURE
FOULING FACTOR
PRESSURE DROP
NOZZLE ARRANGEMENT IN
NOZZLE ARRANGEMENT OUT
LEAVING TEMPERATURE
RETURN TEMPERATURE
GPM
TUBES
DESIGN LOAD - EVAPORATOR
---------------------------------------------------------------------------------
PASSES
DESIGN WORKING PRESSURE
FOULING FACTOR
PRESSURE DROP
NOZZLE ARRANGEMENT IN
NOZZLE ARRANGEMENT OUT
LEAVING TEMPERATURE
RETURN TEMPERATURE
GPM
TUBES

FIGURE 52 - SAMPLE PRINTOUT (SALES ORDER)

FORM 160.69-O1