Battery Connection & Charging Requirements
Disconnecting Equipment
Follow the below instructions to completely isolate the equipment.
Step 1. Turn off the 40A "marked" main grid breakers located in the main
service panel.
Step 2. Turn off the battery breaker located in the inverter distribution box.
Step 3. Turn off both (interlocked) Load Input Selection breakers located
on the left side, outside of the distribution box.
WARNING:
after disconnecting all above sources of power.
40
Internal capacitors can remain charged for 5 minutes
Installation Manual