50 Installing the 8010co chassis
4
5
6
7
8
9
10
Installing and Maintaining the Ethernet Routing Switch 8000 Series Chassis
Copyright © 2007, Nortel Networks
.
See the figure
"Installing the installation shelf in a 19-in. equipment
rack" (page
50).
Add a hex nut to each screw and tighten using a hex wrench.
Tighten each screw with a Phillips screwdriver.
If the holes in the rack's vertical supports require clip nuts, insert a
clip nut in each of the 12 locations.
Lift the 8010co chassis onto the installation shelf.
WARNING
It requires three people to lift the 8010co chassis. To
make the chassis lighter, remove the I/O modules and
power supplies before lifting.
Holding the 8010co chassis in position, align the flanged end of the
chassis mounting rail with the six holes on either side of the vertical
rack support.
See the figure
"Installing the 8010co chassis in a 19-in. two-post
rack" (page
51).
Make sure that the hole pairs on either side of the vertical support
match horizontally.
Tighten each screw with a Phillips screwdriver.
Installing the installation shelf in a 19-in. equipment rack
Nortel Ethernet Routing Switch 8600
NN46205-303 01.01 Standard
4.1 2 January 2007