Site Survey with Office DECT 8000
Tripod to hold DBS
!
Power cable for AC feeding
!
Tape measure
!
Map of the building
!
Preparation of S S S S ite
Preparation of
Preparation of
Preparation of
Configure the following test environment.
Office DECT 8000
To carry out the site survey, you will need to:
1. Install the BSI card in the DCS or Compact II keyphone system.
2. Connect the DBS and the BSI card using the UTP cable.
3. Connect the power cord to the keyphone system.
4. Set the DECT system parameters.
5. Register selected Office DECT 8000 handsets to the DBS.
Refer to Chapter 4, Installation, for full details of all these procedures.

Site Survey Procedure

Before you start cell planning, the coverage estimation for the site should be completed and the
possible DBS locations indicated on the site map. Cell planning is done as follows:
1. At a selected DBS location, set up the test configuration as shown in Preparation of Site Survey
above.
2. Adjust the tripod to place the DBS near the ceiling or at a height of about 2.5m.
3. Press the
button on the handset until you hear a short beep (after about three seconds) and
then press button "2" within one second of hearing the beep.
4. The handset displays the RSSI value of the DBS (see Figure B-1, handset LCD display [8],
shown in Appendix B).
ite S S S S urvey
ite
ite
urvey (Cell Planning)
urvey
urvey
(Cell Planning)
(Cell Planning)
(Cell Planning)
2.5M
Tripod
DBS
Office DECT 8000
Keyphone system
AC power cord

Advertisement

Table of Contents
loading

Table of Contents