HP Aruba 6400 Series Installation And Getting Started Manual page 60

Table of Contents

Advertisement

1
1
Rail secured to front post
2
Rail secured to rear post
3. For mounting the Aruba 6405 Switch, install four cage nuts into the appropriate positions on each of the
front posts. If you are mounting the Aruba 6410 Switch, install eight cage nuts on each front post. (That is,
four cage nuts for each of the two rack ears supporting each side of the switch).
1
2
3
60
1
2
3
4
5
6
7
Unattached rack ear used as a guide for cage nut
placement. (See step 3a, below.)
Cage nut at bottom of seventh 1U.
Cage nut at bottom of sixth 1U.
2
Table Continued
Aruba 6400 Switch Series Installation and Getting Started
Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aruba 6405Aruba 6410

Table of Contents