Baxi Ecogen 24/1.0 Installation & Servicing Instructions Manual page 34

Gas fired wall mounted condensing boiler and power generator
Table of Contents

Advertisement

Fig. 24
Fig. 25
Fig. 26
page 33
9.2 Fitting The Boiler
1. Using a suitable lifting device, lift the appliance on its base packaging. Offer the appliance up to the wall plate and engage the bottom edge of the back of the appliance on
to the wall plate (Figs. 27 & 28). 
Ensure that there is adequate clearance for the lifting equipment (see Section 7.2).
2. Push the appliance back onto the wall plate and engage the securing nuts at the top of the appliance by sliding to the right and swinging down (Figs. 28 & 29).
3. Tighten the two securing nuts on the wall plate and complete the securing of the appliance by replacing the two screws previously removed. (Figs. 29 & 30).
4. Remove the base packaging.

Advertisement

Table of Contents
loading

Table of Contents