High efficiency wall hung condensing gas boiler (36 pages)
Summary of Contents for Baxi Platinum Combi 24
Page 1
United Kingdom Installation and Service Manual Gas Fired Wall Mounted Condensing Combination Boiler P P latinum Combi 24 - 28 - 33 - 40 These instructions include the Benchmark Commissioning Checklist and should be left with the user for safe keeping. They must be read in conjunction with the Flue Installation Guide.
Page 4
Installation of gas fired hot water boilers. EC - Declaration of Conformity BS 5440 Part 1 Flues. Baxi Heating UK Limited being the manufacturer / distributor within the European BS 5440 Part 2 Ventilation. BS 7074 Expansion vessels and ancillary equipment for Economic Area of the following sealed water systems.
1.0 Introduction Description 1. The Baxi Platinum Combi is a fully automatic gas fired wall mounted condensing combination boiler. It is room sealed and fan assisted, and will serve central heating and mains fed Case Front Panel domestic hot water.
6.0 System Details Information 1. The Baxi Platinum Combi Condensing Combination Boiler is a ‘Water Byelaws Scheme - Approved Product’. To comply with the Water Byelaws your attention is drawn to the following installation requirements and notes (IRN). a) IRN 001 - See text of entry for installation requirements and notes.
Page 43
4 full turns clockwise (Fig. 73). If the boiler will not light, or the correct CO cannot be achieved contact Baxi Customer Support 0344 871 1525. 13.25 Expansion Vessel (Fig. 74) 1. Drain the primary circuit and undo the nut on the vessel Fig.
Page 54
GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty.
SERVICE RECORD It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE 01 SERVICE 02 Date:...
For the warranty to be maintained, please make sure... Benchmark checklist is completed Warranty is registered with Baxi The boiler has an annual service For full terms and conditions, visit www.baxi.co.uk/terms. Failure to adhere to terms and conditions will void your manufacturer’s warranty. Baxi Brooks House,...