A General Warnings; B Warnings For The Installer; Power; Materials To Be Used - Wega Mininova Use And Maintenance Manual For The Technician

Hide thumbs Also See for Mininova:
Table of Contents

Advertisement

A
General Warnings
The manufacturer of the equipment cannot be held
responsible for damage caused by failure to oblige to
the requirements below.
B
Warnings for the installer
• Read this manual carefully. It provides important
information on safe installation, operation and main-
tenance of the equipment;
• Installation, conversion to other type of gas, and
maintenance of the equipment must be carried out
by personnel qualified and authorized by the manu-
facturer, in compliance with safety regulations and
instructions included in this manual;
• identify the model of the equipment. The model is
shown on the packaging and on the nameplate of
the machine;
• Install the equipment only on sites where there is
good ventilation;
• Do not obstruct the ventilation and exhaust holes on
the machine;
• Do not tamper with the equipment components.
At the end of the installation, the installer has
to fill the "Installation Card" carryed out with
the machine. On this form must be confirmed
the conditions provided by hygiene and safety
!
regulations in the place of installation and must
be reported notes about changes and modification
due to a correct function of the machine.
Copies of "Installation Card" must be kept by
the user and installer until the end life of the
machine. In case of withdrawal of the machine,
the installer must provide for the withdrawal of the
"User's Installation Card".
Technical manual
B.1

Power

The water supply of the appliance must be carried out
with water which is suitable for human consumption, in
compliance with the regulations in force int the place
of installation. The owner / manager of the system must
confirm to the installer that the water meets the above
listed requirements.
B.2

Materials to be used

During the installation of the appliance the
components and materials that were provided with
the appliance are to be used. Should the use of other
components be necessary, the installer must verify their
suitability to be used in contact with water used for
human consumption.
B.3

Hydraulic connections

The installer must carry out the hydraulic connections
in accordance with the hygiene norms and the hydraulic
safety norms for environmental protection in force in the
place of installation.
B.4

Activation

When installation is complete, the appliance has to be
started, brought to the nominal working condition and
left for 30 minutes in the "ready to operate" condition.
Afterwards, the appliance has to be turned off and
emptied of the first water introduced in the whole
hydraulic circuit, to eliminate possible initial impurities.
Then the appliance must be once again loaded and
brought to the nominal working conditions.
After having reached the "ready to operate" condition,
the following deliveries have to be performed:
1.
for each coffee group make a continous erogation
to discharge all volume of water contained in each
coffee tank combined;
2.
release the whole volume of hot water inside the
boiler by performing a continuous delivery from the
appropriate nozzle. In the case of several dispensing
points, divide the volume on the base of the number
of the dispensing points;
3.
continuously release steam for at least 1 minute for
each steam dispensing point.
ROSSO
C:0 M:100 Y:100 K:0
NERO
C:0 M:0 Y:0 K:100
VERDE
C:100 M:0 Y:100 K:0
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents