Step 1: Prepare The Site - NETGEAR GS418TPP Hardware Installation Manual

Easy-mount 16-port gigabit high power poe+ smart managed pro switch with 2 sfp ports 240w
Hide thumbs Also See for GS418TPP:
Table of Contents

Advertisement

Easy-Mount 16-Port Gigabit High Power PoE+ Smart Managed Pro Switch with 2 SFP Ports (240W)

Step 1: Prepare the Site

Before you install the switch, ensure that the operating environment meets the site
requirements that are listed in the following table.
Table 2. Site Requirements
Characteristics
Requirements
Mounting
• Desktop installations. Provide a flat table or shelf surface.
• Wall installations. Use a mount that is supplied with the switch to attach the switch to
• Attached to a rectangular table leg or pole with a secure locking tab. Use a mount
• Rack-mount installations. Use a 19 inch (48.3 centimeter) EIA standard equipment
Access
Locate the switch in a position that allows you to access the front panel ports, view the
front panel LEDs, and access the power connector.
Power source
Use the AC power cord that is supplied with the switch. Make sure that the AC outlet is
not controlled by a wall switch, which can accidentally turn off power to the outlet and
the switch. Power supply cord must not be attached to the building surface, nor run
through walls, ceilings, floors and similar openings in the building structure.
Installation
Model GS418TPP
a wall.
with rubber belts, all of which are supplied with the switch, to attach the switch almost
anywhere, such as a table leg or rectangular pole.
rack that is grounded and physically secure. You also need the rack-mount kit that is
supplied with the switch.
17
Hardware Installation Guide

Advertisement

Table of Contents
loading

Table of Contents