Commissioning

NOTICE
For a detailed description of parameter settings for the quick commissioning, refer to the
topic "Quick commissioning (Page 38)".
5.1

The built-in Basic Operator Panel (BOP)

5.1.1

Introduction to the built-in BOP

Button functions
Stops the inverter
Single press
Double press (< 2 s) or
long press ( > 3 s)
Starts the inverter
If the inverter is started in HAND / JOG mode, the inverter running icon (
Note:
This button is inactive if the inverter is configured for control from terminals (P0700 = 2, P1000 = 2) and
is in AUTO mode.
SINAMICS V20 Inverter
Operating Instructions, 07/2012, A5E03728167
V V
A A
Hz Hz
1/min kW
1/min
kW
% %
M M
OK
OK
OFF1 stop reaction: the inverter brings the motor to a standstill in the ramp-
down time set in parameter P1121.
Note:
If configured to be an OFF1 stop, this button is inactive in AUTO mode.
OFF2 stop reaction: the inverter allows the motor to coast to a standstill
without using any ramp-down timings.
5
) displays.
29