Starting Initialization - Samson TROVIS 5724-8 Mounting And Operating Instructions

Electric actuators with process controller for heating and cooling applications
Table of Contents

Advertisement

+
UI1
+
UI2
OR
+
UI3
BN
RD
+
UI4
WH
L
I
BK
DANGER
!
Live wire!
BU
Blue
BN
Brown
OR
Orange
− UI3 and UI4 only with device versions
[C] and [D]
− Switching output only with device
versions [B] and [D]
− Configurable inputs (see section 10.2)
Fig. 3: Electrical connection
EB 5724-8 EN
Pt 1000,
red marking
Pt 1000,
blue marking
L N
BN BU
RD
Red
WH
White

5.4 Starting initialization

The actuator needs to be initialized on start-
ing up the actuator for the first time. Mount
the electric actuator with process controller
onto the valve before initialization to ensure
that the initialization values match the on-site
conditions.
We recommend reinitializing the actuator if
the mounting situation changes.
NOTICE
!
The process is disturbed by the movement of
the actuator stem.
Do not perform the initialization while the
process is running. First isolate the plant by
closing the shut-off valves.
Initialization is started using the operating
keys:
Press and hold for six seconds until 'In'
appears on the display. Release the key
within three seconds to start initializa-
tion.
Display: F1
Note
Initialization must be started no later than
three seconds after 'In' appears on the dis-
play. Otherwise, the actuator returns to
closed-loop operation.
After initialization is completed, the actuator
returns to closed-loop operation.
Mounting and start-up
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trovis 5725-8

Table of Contents