START-UP CHECKLIST FOR FAN-ASSISTED
This start-up checklist is to be completely filled out by the service technician starting up the Raypak boilers or heaters for the first
time. All information may be used for warranty purposes and to ensure that the installation is correct. Additionally this form will be
used to record all equipment operation functions and required settings.
GAS SUPPLY DATA
Regulator Model & Size
Gas Line Size (in room)
Length of Gas Line
Low Gas Pressure Setting ________________In. WC
High Gas Pressure Setting________________In. WC
Gas Shut-Off Valve Type
(Ball, Lube cock)
Port
VISUAL INSPECTION OF COMPONENTS
Verify inspection was done and condition of components are
in good working order with a "yes"
Wiring Harness
Burner (flame)
Refractory (Visual)
Remote flame sense
Covers in place for outdoor_________________ Y/N
VENTING
Vent Size: _____________
Vent Material: ____________ sketch vent on reverse side ***
Vent Termination Type: __________________
Combustion Air Openings: Low __________ in
Ventilation Air High __________ in
HO
T (XVers ONLY, If equipped)
2
O
sensor cable is connected to the O
2
DDC power switch is in the ON position _________________
Maintenance switch is in the OFF position _______________
Actuator stops are in the correct position ________________
EMISSIONS SETTINGS AND TEST INFORMATION
Blower Suction Pressure
Supply Gas Pressure
Verify stable pressure static and dynamic condition
The following measurements must be obtained with a calibrated combustion analyzer.
O
2
CO
CO
2
Model Number: ______________________________
*** Note: draw venting with details, such as extractors,
barometric dampers, blast dampers or draft inducers
Job Name _____________________________________________________________________________________________
Address _______________________________________________________________________________________________
Physical Location of Boiler: Indoors_______; Outdoors_______; Ground Level_______; Roof_______; Below Grade________
Mechanical Contractor / Installer ____________________________________________________________________________
Date and Time of Start-up _____________Print Name and Signature of Start-up Technician ______________________________
Information must be faxed to: (805) 278-5496 in order to ensure warranty consideration
RAYPAK PRODUCTS
_________ / ______CFH
________________In. NPT
________________Eq Ft
________________
_______Std______Full
_________________ Y/N
_________________ Y/N
_________________ Y/N
_________________ Y/N
Stack Height:_______
2
2
sensor ____________
2
(AT FULL FIRE)
(AT MIN. FIRE)
_____________In. WC
_____________In. WC
_____________In. WC
_____________In. WC
_____________%
_____________%
_____________PPM
_____________PPM
_____________%
_____________%
CLEARANCES
Front Clearance
Right Side Clearance
Left Side Clearance
Rear Clearance
Overhead Clearance
ELECTRICAL
Voltage Supply (VAC)
Voltage -24 VAC
Voltage Com to Ground
Hot Surface Igniter
Auto High Limit Setting
Manual Reset High-Limit Setting
Operating Control Setting
Sketch plumbing on reverse side
WATER SUPPLY
Flow Rate in GPM or Delta T
Measure flow rate at full fire
Pump Purge setting
Low Water Cutoff
Plumbing Size
Pump Size: __________(Boiler)
Impeller trim_______________
Louvers __________________
(If equipped)
RAYMOTE
Wi-Fi signal available in boiler room
Boiler provisioned with valid WiFi credentials ___________
Wi-Fi signal strength (RSSI > -80) _________________
Nominal Factory Recommended Settings
See manual or card tag
See manual or card tag
See manual
Less than 100 PPM
See manual
Serial Number: _______________________________
Site Elevation Above Sea Level __________________Ft.
_______________In.
_______________In.
_______________In.
_______________In.
_______________In.
No Load____
Load____
_______________VAC
_______________VAC
_______________Ohms
_______________deg F
_______________deg F
_______________deg F
_____________If Avail
_____________Minutes
______________Test
___________________
Pump HP: __________
Pump Model_________
Screens_____________
_____________
Attn: Service Manager