Adding Process Displays - ABB IndustrialIT Compact HMI 800 Getting Started

Table of Contents

Advertisement

Adding Process Displays

Move objects by selecting and dragging each of the device object to the correct
function in the plant.
Figure 37. The Functional Structure
If you later add new objects, Only copy the new or changed objects from the F
column to the E column WARNING: When you close the BDM tool, select "NO"
on the question "Save document".
Adding Process Displays
When the basics of the Functional Structure are defined, it is time to define the
displays. Structures and relationships between displays, can be defined in the
Functional Structure. As a general rule, the Device Instances that have been created
in the Control Structure, should additionally be placed into the proper place in the
Functional Structure to support the displays (this was done in the previous chapter).
First add a structural object to host the graphics display as a graphics aspect (if you
did not go through the previous chapter).
1.
Select Functional Structure and the Root object.
2.
Open the context menu and select New object.
3.
Select a suitable object type depending on your application.
4.
Name it for example E.g. MU1.
5.
Click Create.
6.
Right-click the object and select New Aspect.
7.
Select the Graphics Display in the list and click Create.
68
Section 4 Engineering
3BSE040587R4401

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents