Powder Winding, Two-Reel Switching - Mitsubishi LE-40MTB-E Instruction Manual

Tension controller
Table of Contents

Advertisement

6.8 Powder winding, two-reel switching

In the two-reel operation, the contacts inter-
locking with reel change are connected to
MC2. When this contact input changes from
ON to OFF or OFF to ON, the control output
is preset to the new reel preset value. When
the preset timer times up, the automatic con-
trol starts here. Interlock this signal with the
cutter operation. Switch SW1 at the same
time as SW2 and SW3.
For the preparatory drive of the new reel, turn
on the auxiliary power supply in a few sec-
onds but not later than 10 seconds immedi-
ately before switching the reels.
In the two-reel winding operation, the me-
chanical loss cancel torque MLA and MLB
are changed over. When it is OFF, the me-
chanical loss cancel value set to the reel A
becomes valid. When it is ON, the mechani-
cal loss cancel value set to the reel B is valid.
This is effective when the mechanical loss of
the reel A differs greatly from that of reel B.
See page 35.
1. Connection of switch-over 2-reel powder
Reel exchange
SW1
2. Setting
For setting the new reel preset value and preset time, refer to Section 6.7 "Powder unwinding, two-reels
switching" on the previous page.
0.1Ω
12V
MCC
0.1Ω
MC2
New reel
preset
MC2 input
Reel exchange
Preset timer
P-N
control output
Auxiliary
power output
PA (control output +
auxiliary power output )
PB (control output +
auxiliary power output )
PA and PB is control output for powder to A/B shaft.
Reel exchange
SW2
P
SW3
N
SW4
S1
S2
Predrive
SW5
torque
adjustment
24
A reel
A reel
B reel
New reel preset
Old reel stop
PA
DA, RA
PB
DB, RB
PA , PB : Powder clutch/brake
(hysteresis clutch/brake)
DA , DB : Commutation diode
200V,5A
RA , RB : Protection resistance
10W,47Ω

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents