Mitsubishi LE-40MTB-E Instruction Manual page 51

Tension controller
Table of Contents

Advertisement

• The contact data is an OR command. Accordingly, it becomes effective if the input on the main unit side
is turned on. Pay rigid attention.
The time required to transfer the contact data is as follows.
Required time (ms) ≒ 100 + (Operation cycle in the master programmable controller)
• Because the high-speed parallel run mode is not supported, do not use it. Accordingly,
do not turn on the M8162.
4. Connection
The RS-485 board FX2N-485BD is required for the parallel wire link.
Connect between the LE-40MTB-E and the wire link adaptor with the twisted pair cables. Perform the
solid grounding at [ LFG ] in the LE-40MTB-E. The allowable maximum cable length is 10 m.
LE-40MTB-E
5. Setting
To execute parallel link with the LE-40MTB-E, use the " PC-link " screen in " Other " on the engineer
screen for setting.
Reel diameter
monitor or tension
monitor screen.
P
A
S S W O R D
S
E
T T I N G
S W I T C H
P
C
- L I N K
U N U S E
LSA
LSB
LFG
Grounding resistance
100Ω or less
Complete
initial setting
S E T → # # # # #
S E L E C T
M E N U
:
T E N S I O N
:
S T R T
S
E
T T I N G
S E L E C T
R E E L
C H G :
R E E L
S E L E C T
P C - L I N K
:
F X - P A R A L :
N E T /
Select " FX-PARAL "
47
Twisted pari cable
SDA
FX
FX2N siries
2N
-485-BD
PC
RDA
SDB
RDB
SG
S E T
N U M B E R
B Y
C U R S O R
.
S T P :
R E E L
M E N U
B Y
C U R S O R
:
M R N U
M
I N I :
C C - L I N K
C H G :
:
O T H R E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents