Fortinet FortiGate Series Administration Manual page 728

Hide thumbs Also See for FortiGate Series:
Table of Contents

Advertisement

Configuring FortiAnalyzer report schedules
728
Figure 451: Report schedules in Report Config
General report schedule settings
Create New
Name
Description
Report Layout
Schedule
Delete and Edit icons
Clone icons
Report schedule configuration settings
Name
Description
Report Layout
Language
Create a new report schedule.
The name of the report schedule.
The comment made when the report schedule was created.
The name of the report layout used for the report schedule.
When the report schedule will be generated. The time depends on
what time period was selected when the report schedule was created:
once, daily, or specified days of the week.
For example, if you select monthly, the days of the month and time
(hh:mm) will appear in the format Monthly 2, 10, 21, 12:00.
Delete or edit a report schedule in the list.
Create a duplicate of the report schedule and use it as a basis for a
new report schedule.
Enter a name for the schedule.
Enter a description for the schedule. This is optional.
Select a configured report layout from the list. You must apply a report
layout to a report schedule. For more information, see the
FortiAnalyzer Administration Guide.
Select the language you want used in the report schedule from the list.
FortiGate Version 4.0 MR1 Administration Guide
Log&Report
Delete
Edit
Clone
01-410-89802-20090903
http://docs.fortinet.com/
Feedback

Advertisement

Table of Contents
loading

Table of Contents