Omron ZEN Operation Manual page 148

Programmable relay
Hide thumbs Also See for ZEN:
Table of Contents

Advertisement

Application Examples
Program Example
I1 Operates
00
I2 Stops
01
@0
M0
02
@1
03
T0
04
I0 Person detected
05
06
Parameter Settings
Weekly timer @0
(Mon to Fri: 7:00 to 10:00)
Water Supply Tank Control
Application
Basic water supply control is possible with the 61F Switch (without float) alone, however
relay logic is required for inverter control of high-speed operation (when empty) and
slow-speed operation (when half-full).
SM0
RM0
Escalator operates
[Q0
TT0
Off delay timer starts
Operates 3 minutes after detection of person.
Weekly timer @1
(Mon to Fri: 17:00 to 22:00)
Appendix D
OFF delay timer T0
125

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents