Figure 2-56 Installation Of The Front Cover - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100
10. Align tabs a to f to holes A to F on Battery Box. Slide the Front Cover into position and tighten the
two screws.
f
Front cover
2-40
d
b
e

Figure 2-56 Installation of the Front Cover

F
D
B
c
a
A
Two screws
(with stopper)
ISSUE 1.0
E
C
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents