Table 2-7 Exife-C1 Packing List; Figure 2-20 Insert The Cpu Board; Figure 2-21 Connectors Of Exife-C1; Installation Of The Exife-C1 - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100
5.
Insert the CPU board in the guide rail of Main Chassis and push it securely into position, and
tighten the two screws.

1.7.3 Installation of the EXIFE-C1

1.7.3.1 Unpacking
Unpack the EXIFE-C1 and check it against physical damage.
Items
EXIFE-C1
1.7.3.2 Connectors Location
J2 (EXP)
2-16
Guide rail

Figure 2-20 Insert the CPU Board

Table 2-7 EXIFE-C1 Packing List

List of Contents
EXIFE-C1 Board
Expansion Cable
Ferrite Core (North America use only.)

Figure 2-21 Connectors of EXIFE-C1

CPU board
EXIFB-C1
Screws
QTY
1
1
1
J1
ISSUE 1.0
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents