Figure 3-1 Power Switch Location; Figure 3-2 Alm Led And Run Led Location - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100
1.
Set the power switch to off position.
2.
Once the system has powered off, push in and hold the LOAD button on the CPU board.
If Expansion Chassis are installed, the Power Switch must be ON at
Expansion Chassis.
3.
Turn the power switch ON at the Main Chassis.
4.
Continue holding the LOAD button for approximately three seconds or until ALM LED lights (red).
5.
Release the LOAD button.
3-2

Figure 3-1 Power Switch Location

LOAD button
ALM LED
RUN LED
CPU board

Figure 3-2 ALM LED and RUN LED Location

< Side View >
ISSUE 1.0
System Start Up

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents