Fryers With Casters - Vulcan-Hart GRM SERIES Installation And Operational Manual

Gas fryers
Hide thumbs Also See for GRM SERIES:
Table of Contents

Advertisement

Available languages

Available languages

GRM SERIES GAS FRYERS
TESTING THE GAS SUPPLY PIPING SYSTEM:
When test pressures exceed ½ PSI (3.45 kPa), the fryer and its individual shutoff valve must
be disconnected from the gas supply piping system.
When test pressures are ½ PSI (3.45 kPa) or less, the fryer must be isolated from the gas
supply piping system by closing its individual shutoff valve.

Fryers with Casters:

Separate instructions for installing casters are included with the casters:
The installation shall be made with a connector that complies with the
Standard for Connectors for Movable Gas Appliances, ANSI Z21.69, CAN/CGA-6.16,
and a quick-disconnect device that complies with the Standard for Quick-Disconnect
Devices for Use with Gas Fuel, ANSI z21.41 CSA 6.9 or Quick-Disconnect Devices for
Use with Gas Fuel,
When installing a quick disconnect you must also install a means for
limiting the movement of the fryer. This device will prevent the gas line or quick
disconnect from being strained. The restraining device should be attached to the
cutout on the back panel. See illustration for location.
The fryer must be installed with a connector (not supplied by Vulcan) complying
with the above codes.
The fryer must be installed with restraining means to guard against transmission of
strain to the connector. See illustration.
The fryer must be installed with the casters provided.
VULCAN-HART
F-45385 Rev. C (9-15)
-8-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents