Suzuki GS1100G 1982 Service Manual page 154

Table of Contents

Advertisement

4-39 SHAFT DRIVE
INSTALLATION OF PROPELLER SHAFT
AND FINAL DRIVE GEAR ASSEMBLY
For installation,
reverse
the
procedure for
removal.
Apply
SUZUKl BOND No. 121
5
(99104-31 1 10)
t o the
end
of the
swing arm.
- -
a
Coat propeller shaft splines
with Lithium
Base
Molybdenum
Grease
(NLGI #2).
Install the final driven gear assembly, making
sure the propeller
shaft
splines are aligned into
the coupling.
/
Torque the final
gearcase
joint nuts
to specifica-
tions.
Tightening torque
Tighten the final gear case drain
plug.
3.5
-
4.5
kg-m
(25.5 - 32.5
Ib-ft)
-
-m
Add Hypoid
gear
oil through filler hole until
lwel
is equal to filler hole
opening
level.
Tightening
torque
2.0 -
3.0
kg-rn
(14.5
- 21.5 Ib-ft)

Advertisement

Table of Contents
loading

Table of Contents