Before Starting Operations; Spindle Run-In (Warm-Up) - Roland DWX-30 User Manual

Table of Contents

Advertisement

4-1 Before Starting Operations

Spindle Run-in (Warm-up)

In any of the following cases, perform run-in (warm-up) operation for the spindle. Failure to do so may result
in unstable spindle rotation.
 When using for the first time after purchase
 After moving the machine and reinstalling it at a different location
 After replacing the spindle unit
 When using in a low-temperature environment
Spindle Run-in takes maximum one hour.
Procedure
Close the front covers.
Go to [Start Menu], and click [All Programs] (or [Program]) - [Roland VPanel for DWX-
30] - [VPanel].
The VPanel program starts.
66
Chapter 4 Performing Cutting
Chapter 4 Performing Cutting
Click [Setup].
The [Setup] window appears.
Click [Modeling Machine] tab.
Click [Run-in].
The run-in operation starts.

Advertisement

Table of Contents
loading

Table of Contents