Grounding And Cable Management - KB Racking BarnRack Installation Manual

Table of Contents

Advertisement

Grounding and Cable Management

Panels can be cabled as they are installed. Install grounding wires across
1
each continuous row, once per rail extensions.
2
Insert uninsulated grounding wire into each grounding lug.
3
Each continuous row of panels is grounded once on the end of the rails
IMPORTANT
When bonded, any one panel OR group of panels
can be removed without disrupting the bonding
path.
17

Advertisement

Table of Contents
loading

Table of Contents