Genie GRC-12 Operator's Manual page 37

Hide thumbs Also See for GRC-12:
Table of Contents

Advertisement

First Edition • First Printing
Observe and Obey:
Only qualified riggers should rig and lift the
machine.
Be sure the crane capacity, loading surfaces
and straps or lines are sufficient to withstand
the machine weight. See the serial label for the
machine weight.
Loading the Machine With a
Crane
Use the lifting eye mounted on the rear mast
column.
Make sure the mast is fully lowered.
Inspect the machine and remove any loose or
unsecured items.
Always place the lifting hook through the lifting eye
so that it points away from the machine.
Part No. 133136
Transport and Lifting Instructions
Lifting the Machine with a Forklift
Be sure the extension deck, controls and
component trays are secure. Remove all loose
items on the machine.
Fully lower the platform. The platform must remain
lowered during all loading and transport
procedures.
Use the forklift pockets located on both sides of the
chassis, below the covers.
Position the forklift forks in position with the forklift
pockets.
Drive forward to the full extent of the forks.
Raise the machine 15 cm and then tilt the forks
back slightly to keep the machine secure.
Be sure the machine is level when lowering the
forks.
Lifting the machine from the side
can result in component damage.
GRC-12
Operator's Manual
35