Pre-operation Inspection
Be sure that the operator's, safety and
responsibilities manuals are complete, legible
and in the storage container located on the
platform.
Be sure that all decals are legible and in place.
See Inspections section.
Check for hydraulic oil leaks and proper oil
level. Add oil if needed. See Maintenance
section.
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
Electrical components, wiring and electrical
cables
Hydraulic power unit, tank, hoses,
fittings, cylinders and manifolds
Battery pack and connections
Drive motors
Tires and wheels
Ground strap
Limit switches, alarms and horn
Alarms and beacons (if equipped)
Nuts, bolts and other fasteners
Platform entry gate
Sequencing cables and pulleys
Pothole guards
Platform extension
Work trays
Part No. 133136
Brake release components
Battery cover
Mast columns and counterweight
Platform control joystick
Check the entire machine for:
Cracks in welds or structural components
Dents or damage to the machine
Excessive rust, corrosion or oxidation
Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
Note: If the platform must be raised to inspect the
machine, make sure the battery cover is in place.
See Operating Instructions section.