Genie GRC-12 Operator's Manual page 26

Hide thumbs Also See for GRC-12:
Table of Contents

Advertisement

Operator's Manual
Inspections
Test the Pothole Guards
Note: The pothole guards should automatically
deploy when the platform is raised. The pothole
guards activate another limit switch which allows
the machine to continue to function. If the pothole
guards do not deploy, an alarm sounds and the
machine will not drive.
39 Raise the platform.
Result: When the platform is raised 1.2 m from
the ground, the pothole guards should deploy.
40 Press on the pothole guards on one side, and
then the other.
Result: The pothole guards should not move.
41 Lower the platform.
Result: The pothole guards should return to the
stowed position.
42 Place a 2x4 or similar piece of wood under a
pothole guard. Raise the platform.
Result: Before the platform is raised 2.1 m from
the ground, an alarm should sound and the
drive function should not work.
43 Lower the platform and remove the 2x4.
24
GRC-12
First Edition • First Printing
Part No. 133136

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents