Download Print this page

Arrow Storage Products VVCS85 Owner's Manual & Assembly Instructions page 24

8' x 5' normal size
Hide thumbs Also See for VVCS85:

Advertisement

Step 11: Studs
You will need for this page:
SS
(QTY: 10)
1
Following dimensions, measuring from the end of angle, position a Stud Assembly inside top
angle and fasten with one (1) Stone Screw through the lower hole of angle.
2
Place bottom of Stud Assembly over Floor Frame as shown. Do not fasten bottom at this
time. Repeat procedure for the remaining Stud Assemblies around the building.
10 15/16"
(27,8 cm)
Assemblies from step 3:
Stud Assemblies (10)
6
24
Inside
Outside
Do not fasten
at this time.
24P

Advertisement

loading