Step 8: Floor Assembly
You will need for this page:
SS
(QTY: 8)
1
Assemble the four (4) corners of the Floor Frame using two (2) Stone Screws at each corner as
shown.
9402
2
Measure the Floor Frame diagonally. When the diagonal measurements are equal, the Floor
Frame is square.
The Floor Frame must be BOTH square AND
level or the holes will not line up properly.
2
Assemblies from Step 1:
9402
Side Floor
Frame
The remainder of the building assembly requires many hours and more than
one person. Do not continue beyond this point if you do not have enough time
to complete the assembly today. A partially assembled building can be severely
damaged by light winds.
Floor Frame Assemblies (2)
6
21
9402
Overlap Floor Frames as shown.
Set Floor Frame with large holes
on top at each corner.
Level
21P