Download Print this page
Arrow Storage Products ED86LG Owner's Manual & Assembly Instructions

Arrow Storage Products ED86LG Owner's Manual & Assembly Instructions

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
BT01
Model No.
ED86LG
WR86H6
723380817
Storage Area:
43 Sq. Ft.
4,0 m
2
BUILDING DIMENSIONS * Size rounded o to the nearest foot
*Approx.
Size
8' x 6'
97 1/2" x 68 3/4"
2,4 m x 1,7 m
247,7 cm x 174,6 cm
ED86
ED86SB
SBVD86 A 697.68616 A
VD86EU
271 Cu. Ft.
7,7 m
3
Exterior Dimensions
Base
(Roof Edge to Roof Edge)
Size
Width
99 3/4"
253,4 cm
ED86Z
WR86
VDGY86
Depth
Height
Width
71 1/4"
79 1/8"
94 3/4"
181,0 cm
201,0 cm
240,7 cm
WR86EU
VDGY86EU
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
(Wall to Wall)
Depth
Height
66"
77 7/8"
167,6 cm 197,8 cm
ED86BS
VD86
Door
Opening
Width
Height
43 1/2"
69 1/4"
110,5 cm 175,9 cm

Advertisement

loading

Summary of Contents for Arrow Storage Products ED86LG

  • Page 1 Owner's Manual & Assembly Instructions BT01 Model No. ED86 ED86Z ED86BS ED86LG ED86SB WR86 WR86EU WR86H6 SBVD86 A 697.68616 A VD86 VD86EU VDGY86 VDGY86EU 723380817 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE Storage Area: 43 Sq. Ft. 271 Cu. Ft.
  • Page 2 GB: Assembly manual in additional languages available online. Scan QR code below to access. FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous. SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder.
  • Page 3 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 4 PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 5 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in pieces of your building since some contain the assembly of this building. Be familiar with sharp edges.
  • Page 6 CARE & MAINTENANCE..Finish: For long lasting nish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 7 ACCESSORIES..FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18 m) of steel cable and...
  • Page 8 ORDERING ACCESSORIES..02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is o e ring them to you on a direct basis. SPECIAL NOTE: If your accessory is shipped via truck line a day time phone number is required to arrange delivery.
  • Page 9 Base The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an e ective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire oor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base.
  • Page 11: Table Of Contents

    Hardware BA11 ctr Remove from bag of screws and save for the last step 65900A #10Bx1/2" (13 mm) 65923 65004 Black Screw (8) #8-32x3/8" (10 mm) #8Ax5/16" (8 mm) 65103 (Packed with Screws) #8-32 Hex Nut (93) Bolt (93) Screw (282) 65109 66646 67293...
  • Page 12 Parts List BT12 Assembly Part Part Quantity Check Key No. Number Description in Carton List 8941 Ramp 9379 Front Floor Frame 9377 Rear Floor Frame 9336 Right Rear Wall Angle 9378 Door Track 6617 Door Track Splice 9337 Left Rear Wall Angle 7907 Left Gable 7906...
  • Page 13 Assembly by Key No. BT13...
  • Page 14 Step 1 8941 Ramp (1) Parts Needed For 9379 Front Floor Frame (2) Floor Frame Assemblies 9377 Rear Floor Frame (2) B14 ctr 9379 The front oor frame is made up of 8941 three pieces. The rear oor frame is made up of two pieces.
  • Page 15 Step 2 Parts Needed For 9336 Right Rear Wall Angle (1) Frame Assembly 9337 Left Rear Wall Angle (1) W15 ctr The main frame pieces reinforce the walls. This piece will later be installed at the top edge of the rear wall. Pro- ceed as follows: Overlap the right and left rear wall angle pieces as shown in the...
  • Page 16 Step 3 Parts Needed For 8474 Roof Beam (1) Roof Beam Assembly 8476 Side Wall Angle (1) B16 ctr (10) The roof beams join the two gables and support the roof panels. The main roof beam is made up of two pieces fastened together.
  • Page 17: Door Slide

    Step 4 Parts Needed For 6617 Door Track Splice (1) Door Track Assembly 9378 Door Track (2) B17 ctr NOTE: Door Track Splice (painted part) The door track assembly supports the 6617 sliding doors and reinforces the front wall. It is made up of three pieces. Using the door track splice, (painted), join the door track 66769...
  • Page 18 Step 5 Front Floor Assembly (1) Parts Needed For 8946 Side Floor Frame (2) Floor Frame Rear Floor Assembly (1) B18 ctr RIGHT REAR 8946 STEP 8946 9377 Assemble the four corners of the oor frame using two screws at each 8946 corner as shown.
  • Page 19 5288 Corner Post (4) Step 6 Parts Needed For Door Track Assembly (1) Posts/Top Frames Rear Wall Angle Assembly (1) W19 ctr 9342 Side Wall Angle (2) (22) REAR 5288 5288 NOTE The remainder of the building assembly requires many hours and more than one person.
  • Page 20 Step 7 Parts Needed For 5287 Splice Post (1) Splice Post/Door Jamb 7311 Door Jamb (2) W20 ctr STEP 5287 The door jambs reinforce the door opening and provide an attractive trim. The splice post supports the rear wall. Position splice post at the center of the rear wall and fasten using 4 bolts and nuts into rear wall angle and 2 screws into rear oor frame.
  • Page 21 Step 8 Parts Needed For 9344 Siding Stud (6) Studs W21 ctr The studs provide a surface for at- taching the siding panels. Following dimensions, measuring from the ends of angles, place a stud between each corner and splice post at the rear of building and 2 studs between corner posts at the sides.
  • Page 22: Washer

    Step 9 Parts Needed For 8719 Side Siding (6) Side Siding W22 ctr (24) (28) Each screw in the wall requires a washer. STEP CORRECT INCORRECT STEP Slide side siding into channels of corner posts, flat edge upward, STEP bottom edge down resting on oor 8719 frame.
  • Page 23 Step 10 Parts Needed For 9345 Rear Siding (6) Rear/Front Siding 9746 Front Siding (6) W23 ctr STEP STEP (48) (14) Fasten Top Center of Last Siding to Stud 9345 Slide rear siding into channel of corner and splice posts fastening to 9345 rear frame as shown in previous step.
  • Page 24: 7916 Roof Beam Bracket

    Step 11 Parts Needed For 7906 Right Gable (2) 7907 Left Gable (2) Gable Assemblies 7916 Roof Beam Bracket (4) BT24 STEP Edge Trim (Plastic Piece) The gables go on top of the front and rear walls to support the roof beams. NOTE The gables are packed nested together and might be mistaken...
  • Page 25 Step 12 Left Gable Assemblies (2) Parts Needed For Right Gable Assemblies (2) Gables/Braces 6658 Gable Brace (2) W25 ctr (24) Lift and fasten a right and left gable, under angle at corner, to the rear wall angle with screws. Hint: On the rear gable, use a bolt and nut at the overlapping rear wall angle.
  • Page 26 Step 13 Parts Needed For Main Roof Beam (1) Roof Beams 8474 Roof Beam (2) W26 ctr (12) Fasten the main roof beam to STEP the gable brace of the front gable. Fasten the other end of the main 8474 Roof Beam roof beam to the gable brace of the rear gable.
  • Page 27: Bolt

    Step 14 Parts Needed For 8466 Right Roof Panel (1) Right Roof Panel BT27 STEP 8466 8467 Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner 7875 7875 of the building. Each screw and bolt in the roof requires a washer.
  • Page 28: Screw

    Step 15 Parts Needed For 8467 Left Roof Panel (2) 7875 Roof Panel (4) Roof Assembly 8466 Right Roof Panel (1) W28 ctr STEP STEP 8467 Left Roof Panel Weather Stripping Tape Roll (38) (23) 8466 Right Roof Panel Install a left roof panel at the left rear and right front corner of the roof.
  • Page 29: Peak Cap

    Step 16 Parts Needed For 8461 Ridge Cap (1) Ridge Cap/Roof Trim 8482 Side Roof Trim (2) W29 ctr STEP (26) 8461 Install the ridge cap on the com- pleted roof section using bolts. Do not fasten the ends of the ridge cap until instructed to do so.
  • Page 30 Step 17 Parts Needed For 10484 Right and Left Doors (2) 10498 Horizontal Door Brace (4) Door Assembly 6301 Vertical Door Brace (2) BA30 ctr (12) The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door.
  • Page 31 Step 18 Parts Needed For Right Door Assembly (1) Door Installation & Adjustment Left Door Assembly (1) P31 ctr Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the STEP STEP building) behind door jamb into the...
  • Page 32 ED86SB ED86 ED86Z ED86BS ED86LG WR86 WR86EU WR86H6 697.68616 A SBVD86 A VDGY86 VDGY86EU VD86 VD86EU BT32 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time.