Check Pinion Projection Length - Yanmar 3TNV82A Service Manual

Tnv series
Hide thumbs Also See for 3TNV82A:
Table of Contents

Advertisement

STARTER MOTOR
7. Carefully install the armature assembly
(Figure 11-30, (1)) into the field coil assembly
(Figure 11-30, (2)).
(1)
Figure 11-30
8. Position the brush springs in brush holders
(Figure 11-31). Reinstall the brushes in the
brush holders. Reversing the brushes will cause
the starter motor to turn backwards.
Figure 11-31
9. Carefully install the brush holder assembly to
the armature assembly.
10. Reinstall the field coil assembly with the
armature assembly to the gear housing.
11. Reinstall the rear cover to the brush holder
assembly. Securely tighten the two bolts.
11-18
12. Reinstall the two M4 through bolts
(2)
0000269

Check Pinion Projection Length

1. Connect the positive (+) lead from a battery to
2. Connect the negative (-) lead to the "M"
3. Lightly pull the pinion away from the gear
4. Turn the switch ON and measure the pinion
0000106
(Figure 11-32). Securely tighten the through
bolts. Reconnect the wire to the magnetic
switch assembly. Tighten the M8 nut. Reinstall
the cover over the connection.
Figure 11-32
the "S" terminal.
terminal.
housing.
moving distance L in the thrust direction
(Figure 11-33). Perform this test within 10
seconds. See Starter Motor Specifications on
page 11-7 for the service limit.
Figure 11-33
TNV DI Service Manual
Starter Motor
0000104
0000132

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents