P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Trane Supplied
Type of Requirement
Trane Installed
Relief
•
Insulation
•
Flanged (optional)
Water Piping Connection
•
Components
Other Materials
"CenTraVac™ Chiller
Installation Completion
and Request for Trane
Service," p. B–1
(CTV-
ADF001*-EN; refer to
"Forms and Check
Sheets," p.
A–1)
•
Chiller start-up
commissioning
(a)
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane® products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.
Storage Requirements
N N O O T T I I C C E E
I I n n s s u u l l a a t t i i o o n n D D a a m m a a g g e e ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w t t h h e e s s e e i i n n s s t t r r u u c c t t i i o o n n s s c c o o u u l l d d r r e e s s u u l l t t i i n n
i i n n s s u u l l a a t t i i o o n n d d a a m m a a g g e e . .
T T o o p p r r e e v v e e n n t t d d a a m m a a g g e e t t o o f f a a c c t t o o r r y y i i n n s s t t a a l l l l e e d d i i n n s s u u l l a a t t i i o o n n : :
• •
D D o o n n o o t t a a l l l l o o w w t t h h e e i i n n s s u u l l a a t t i i o o n n t t o o b b e e e e x x p p o o s s e e d d t t o o
e e x x c c e e s s s s i i v v e e s s u u n n l l i i g g h h t t . . S S t t o o r r e e i i n n d d o o o o r r s s o o r r c c o o v v e e r r w w i i t t h h
c c a a n n v v a a s s t t o o p p r r e e v v e e n n t t e e x x p p o o s s u u r r e e . .
• •
D D o o n n o o t t u u s s e e t t h h i i n n n n e e r r s s a a n n d d s s o o l l v v e e n n t t s s o o r r o o t t h h e e r r t t y y p p e e s s
o o f f p p a a i i n n t t . . U U s s e e o o n n l l y y w w a a t t e e r r b b a a s s e e l l a a t t e e x x . .
Less than 1 month
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
12
Trane Supplied
Field Installed
•
Rupture disk assembly
Insulation (optional)
Flanged (optional)
•
Welded on flange for
300 psig (2068.4 kPaG)
waterboxes
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane®
products
1–6 months
Location requirements:
•
Solid foundation
•
Vibration free
•
Dry
•
Temperature range -40°F to 158°F
(-40°C to 70°C)
•
Do not remove any plastic coverings
•
Do not charge the chiller with refrigerant
•
If additional refrigerant is on site, follow
manufacturer's storage requirements
Field Supplied
Field Installed
RuptureGuard™
(optional); refer to
Installation, Operation,
•
Vent line and flexible connector and vent line from
and Maintenance:
rupture disk to atmosphere
RuptureGuard Pressure
Relief System Option
(CTV-SVX06*-EN)
•
Insulation
•
Chiller feet insulation
Victaulic®
Victaulic® to flange
•
Victaulic® coupling for 150 psig (1034.2 kPaG) and
adapter for 150 psig
300 psig (2068.4 kPaG) waterboxes
(1034.2 kPaG)
•
Fasteners for flanged-type connections (optional)
waterboxes
•
Trace gas (1 lb [0.45 kg] maximum per machine as
needed to perform leak testing)
•
Dry nitrogen (8 psig [55.2 kPaG] maximum per
machine as needed)
•
To be completed by installing contractor prior to
contacting Trane for start-up
•
Move empty refrigerant containers to an easily
accessible point of loading
Greater than 6 months
Location requirements:
•
•
•
•
•
•
•
Solid foundation
Vibration free
Dry
Temperature range -40°F to 158°F
(-40°C to 70°C)
Do not remove any plastic coverings
Do not charge the chiller with refrigerant
If additional refrigerant is on site, follow
manufacturer's storage requirements
CVHE-SVX02M-EN