5.3.6 Clearances - Access in Service

1.
A flat vertical area is required for the installation of the boiler.
2.
These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement
Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler.
*These are MINIMUM recommended dimensions. Greater clearance will aid installation and maintenance.