Dimensions And Connections/Clearances - Baxi Assure Combi 36 LPG Installation And Service Manual

High efficiency wall hung condensing gas boiler
Hide thumbs Also See for Assure Combi 36 LPG:
Table of Contents

Advertisement

3.3

Dimensions and connections/clearances

Fig.3
Dimensions and connections / clearances
5
450
390
5
178
700
200
285
5
1
2
3
4
5
6
7
8
9
10
11
The clearances shown in the diagram are minimum requirements to allow
for case removal, spanner access and air movement. These should be ob­
served at all times and kept clear of obstructions.
See
The back cover for contact details.
1
2
10
3
4
Condensate trap sump
Condensate drain
Heating circuit water flow
Hot water outlet
Gas inlet
Pressure relief pipe
Cold water inlet
Heating circuit water return
Pump drain point
Boiler drain point on flow isolation tap
Cable entry points
3 Technical specifications
11
5
7
6
8
9
PN-0000338
17

Advertisement

Table of Contents
loading

Table of Contents