Safety; General Safety Instructions; Recommendations; Specific Safety Instructions - Baxi EcoBlue Advance 13 Heat ErP Installation And Service Manual

Gas fired wall mounted condensing boiler
Hide thumbs Also See for EcoBlue Advance 13 Heat ErP:
Table of Contents

Advertisement

Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual
page 11

2 Safety

2.1 General Safety Instructions

DANGER
If you smell gas:
1. Turn off the gas supply at the meter
2. Open windows and doors in the hazardous area
3. Do not operate light switches
4. Do not operate any electrical equipment
5. Do not use a telephone in the hazardous area
6. Extinguish any naked flame and do not smoke
7. Warn any other occupants and vacate the premises
8. Telephone the National Gas Emergency Service on:- 0800 111 999

2.2 Recommendations

WARNING
Installation, repair and maintenance must be carried out by a Gas Safe Registered Engineer
(in accordance with prevailing local and national regulations).
When working on the boiler, always disconnect the boiler from the mains and close the main gas inlet valve.
After maintenance or repair work, check the installation to ensure that there are no leaks.
CAUTION
The boiler should be protected from frost.
Only remove the casing for maintenance and repair operations.
Replace the casing after maintenance and repair operations.
page 12

2.3 Specific Safety Instructions

2.3.1 Handling

General
The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance.
Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands. Health &
Safety is the responsibility of EVERYONE.
Before lifting the boiler, the circumstances of the installation must be assessed, please use appropriate manual handling techniques and equipment.
Do not handle or lift unless you feel physically able.
Wear appropriate Personal Protection Equipment e.g. protective gloves, safety footwear etc.
Preparation
Co-ordinate movements - know where, and when, you are both going.
Minimise the number of times needed to move the boiler - plan ahead.
Always ensure when handling or lifting the route is clear and unobstructed. If possible avoid steps, wet or slippery surfaces, unlit areas etc. and take special care on
ladders/into lofts.
Technique
When handling or lifting always use safe techniques - keep your back straight, bend your knees. Don't twist - move your feet, avoid bending forwards and sideways and
keep the load as close to your body as possible.
Where possible transport the boiler using a sack truck or other suitable trolley.
Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the centre of gravity, repositioning yourself as necessary. See the
"Installation" section of these instructions for recommended lift points.
Remember
The circumstances of each installation are different. Always assess the risks associated with handling and lifting according to the individual conditions.
If at any time when installing the boiler you feel that you may have injured yourself STOP !! DO NOT "work through" the pain - you may cause further injury.
IF IN ANY DOUBT DO NOT HANDLE OR LIFT THE BOILER - OBTAIN ADVICE OR ASSISTANCE BEFORE PROCEEDING !
page 13

3 Technical Specifications

3.1 Technical Data

Appliance Type
Appliance Category
Heat Input Qn Hs (Gross)
13 model
16 model
19 model
25 model
30 model
8 of 55
C
C
C
13
33
53
CAT I
2H
Max
Min
kW
14.88
8.59
kW
18.32
8.59
kW
21.75
8.59
kW
28.62
8.59
kW
34.35
8.59
http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...
23/01/2018, 11:44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents