Initial Preparation - Baxi EcoBlue Advance 13 Heat ErP Installation And Service Manual

Gas fired wall mounted condensing boiler
Hide thumbs Also See for EcoBlue Advance 13 Heat ErP:
Table of Contents

Advertisement

Baxi EcoBlue Advance 13, 16, 19, 25, 30 Heat ErP Installation Manual
Fig. 18

5.4.2 Initial Preparation

1.
After considering the site requirements, position the fixing template on the wall ensuring it is level both horizontally and vertically
2.
Mark the position of the four most suitable fixing slots for the wall bracket, the lower securing point and the position of the centre of the flue hole whether rear, top or side
flue.
3.
If required, mark the position of the gas and water pipes, and the electrical supply. Remove the template.
4.
Cut the hole for the required flue position (rear, top or side) using a minimum diameter of 116mm.
Fig. 19
Fig. 20
For "In Case" rear flue installation the flue must be set to size and secured to the wall bracket before the boiler is fitted (see
5.
Drill the wall as previously marked to accept suitable wall plugs. Secure the wall bracket using appropriate fixing screws.
6.
Using a spirit level ensure that the bracket is level before finally tightening the screws
7.
For top flue installation, the flue can be fitted after the boiler has been fitted to the wall bracket (see
Fig. 21
If the boiler is being fitted in a cupboard or other place where clearance underneath will be at the minimum 35mm (see
be completed prior to installation.
Also the lower panel retaining cords can be dispensed with - See
8.
Lift the boiler using the lower polystyrene packing and locate the slots in the wall bracket over the horizontal tongues on the wall plate. As the boiler is pushed back the wall
plate spring latch will positively engage over the wall mounted bracket (Figs. AA, BB & CC).
9.
Locate the slots in the safety bracket over the two vertical tongues on the wall bracket and secure with the two screws (Fig CC). Adjust the jack screw to ensure the boiler
is fully vertical and then insert the lower securing screw.
28 of 55
http://interpart.partsarena.eu/System/DATA/Dx/DS1/installation/S219/...
(Fig.
21).
Section
Section 10.2
for removal of the lower panel - the cords can then be disconnected.
(Fig.
20).
Section
6.1.2).
6.1).
Section
5.3.6) all soldering and pipework should
23/01/2018, 11:44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents