Before Installation
At least
1.5°
Fig. 9
cupboard 300mm deep
120mm Min when over
surface 600mm deep
30
EcoBlue Heat
500mm Min
For Servicing
Purposes
270mm
5mm Min
In Operation
35mm Min when in
5.3.6

Clearances - Access in Service

1. A flat vertical area is required for the installation of the boiler.
2. These dimensions include the necessary clearances around
the boiler for case removal, spanner access and air movement
(Figs. 9 & 10). Additional clearances may be required for the
passage of pipes around local obstructions such as joists
running parallel to the front face of the boiler.
*These are MINIMUM recommended dimensions. Greater
clearance will aid installation and maintenance.
370mm
5mm Min
5mm Min
190 mm
625mm
35mm Min*
in Cupboard
120mm Min*
7219717 - 02 (08/15)