General Boiler Information; Service Clearances - Baxi LUNA DUO-TEC 1.70 User Manual

Hide thumbs Also See for LUNA DUO-TEC 1.70:
Table of Contents

Advertisement

Available languages

Available languages

3.

GENERAL BOILER INFORMATION

SERVICE CLEARANCES

Model 1.70
23"
(585 mm)
30"
(763 mm)
11 13/16" in
(300 mm)
1 3/4"
(45 mm)
9 7/8"
(250 mm)
CLEARANCES REQUIRED FOR
CLOSET INSTALLATION
1 3/4"
(45.00 mm)
TOP VIEW
1 3/4"
(45.00 mm)
CLOSED INSTALLATION
0" in /0 mm
between the back of the unit and the wall
7703477.01 (1-03/18)
17 3/4"
(450 mm)
Minimum clearance
from front of boiler
1 3/4"
(45 mm)
BACK
1 3/4"
(45.00 mm)
Model 1.110
25 3/8"
(644 mm)
37 7/16"
(951 mm)
15 3/4"
(400 mm)
1 3/4"
(45 mm)
11 13/16"
(300 mm)
CLEARANCES FOR
COMBUSTIBLES
Model 1.70
(450.00 mm)
1 3/4"
(45.00 mm)
Model 1.110
(600.00 mm)
12
17 3/4"
(450 mm)
Minimum clearance
from front of boiler
1 3/4"
(45 mm)
17 3/4"
1 3/4"
(45.00 mm)
23 5/8"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna duo-tec 1.110

Table of Contents