Rheem 96P series Installation Instructions Manual page 27

4 position condensing two-stage psc gas furnaces
Hide thumbs Also See for 96P series:
Table of Contents

Advertisement

Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED).
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
Notes:
ST-A1194-31-04
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

96mdp series

Table of Contents