Option 2: Standard Horizontal Direct Vent Termination; Option 3: Variant Of Standard Horizontal Direct Vent Termination - Rheem 96P series Installation Instructions Manual

4 position condensing two-stage psc gas furnaces
Hide thumbs Also See for 96P series:
Table of Contents

Advertisement

OPTION 2: STANDARD HORIZONTAL DIRECT-VENT TERMINATION
FIGURE 24
STANDARD HORIZONTAL DIRECT VENTING
1) SUPPORT HORIZONTAL PIPE EVERY FOUR FEET.
2) WHEN 3" PIPE IS USED REDUCE TO 2" BEFORE
PENETRATING OUTSIDE WALL.
3) WHEN USING 3" Ø VENT AND NECKING DOWN TO
2" Ø AS REQUIRED, 18" (46cm) MAX. 2" DIA. PIPE MAY BE USED INSIDE THE WALL.
4) INCREASE THE 12" (31cm) MIN. (U.S.) ABOVE GRADE TO KEEP
TERMINAL OPENINGS ABOVE ANTICIPATED LEVEL OF SNOW ACCUMULATION
WHERE APPLICABLE. CANADA: TERMINATIONS MUST CONFORM TO CSA B149.10, SECT. 8.14.
5) DETAIL "B" INSTALL WIND DEFLECTOR VANE IN 2" PVC COUPLING IN VERTICLE
POSITION USING PVC SOLVENT.
6) THE COMBUSTION AIR TERMINATION MUST BE IN THE SAME PRESSURE ZONE AS
THE EXHAUST TERMINATION.
7) NO SCREENS MAY BE USED TO COVER COMBUSTION AIR OR EXHAUST.
8) NO T'S CAN BE INSTALLED AT THE TERMINATION.
9) WALL PENETRATION AND VENT TERMINATIONS MUST BE WITH 2" Ø PIPE.
OPTION 3: VARIANT OF STANDARD HORIZONTAL DIRECT-VENT TERMINATION
FIGURE 25
VARIANT OF STANDARD HORIZONTAL DIRECT-VENT TERMINATION
NOTE:
1) A TRAP IN THE COMBUSTION AIR PIPE IS NOT REQUIRED FOR THIS OPTION.
2) PIPING EXTERNAL TO THE STRUCTURE MUST BE INSULATED AS REQUIRED
FOR LOCAL CLIMATE
3) WALL PENETRATIONS AND VENT TERMINATIONS MUST BE WITH 2"
WHEN USING 3"
IMUM OF 18" OF 2"
TION) WHEN USING 3"
EXHAUST COUPLIING
EXHAUST: COUPLING
U.S. MIN. 12" (31cm) ABOVE
GRADE OR ANTICIPATED AVG.
SNOW ACCUMULATION
CANADA: TERMINATION MUST
A
CONFORM TO CSA
B149.1-10, SECT. 8.14
60
OPTION A ONLY
NOTE:
1) A TRAP IN THE COMBUSTION AIR PIPE
IS NOT REQUIRED FOR THIS OPTION.
2) PIPING EXTERNAL TO THE STRUCTURE
MUST BE INSULATED AS REQUIRED FOR
PIPE.
VENT AND NECKING DOWN TO 2"
LOCAL CLIMATE.
AS REQUIRED, A MAX-
PIPE IS PERMITTED INSIDE (BEFORE THE PENETRA-
VENT.
REQUIRED
REQUIRED
INTAKE
INTAKE
DETAIL APPLIES TO TERMINATION B ONLY
SEE DETAIL A
COUPLINGS: REQUIRED
ON EXTERIOR, OPTIONAL
ON INTERIOR
CHOOSE
EITHER
NOTE: This detail
applies to the ter-
mination and NOT
the penetration
5" Max. (13cm)
through the wall.
3" Min. (8cm)
U.S. MIN. 12" (31cm) ABOVE
GRADE OR ANTICIPATED AVG.
SNOW ACCUMULATION.
CANADA: TERMINATION MUST CONFORM
TO CSA B149.1-10, SECT. 8.14
9
SEE DETAIL B
FOR DIMENSION
BETWEEN INTAKE
AND EXHAUST
NOTE: This detail
applies to the termi-
nation and NOT the
penetration through
the wall.
B
OPTION B ONLY
NOTE:
1. A TRAP MUST BE INSTALLED IN
THIS OPTION TO PREVENT
WATER FROM ENTERING THE
FURNACE THROUGH THE COM-
EXHAUST COUPLIING
BUSTION AIR PIPE. ORDER KITS
REQUIRED
RXGY-D05 FOR 2" PIPE OR RXGY-
D06 FOR 3" PIPE AND INSTALL
WIND VANE FROM
PER INSTRUCTIONS IN KIT.
FURNACE PARTS
2. PIPING EXTERNAL TO THE
BAG
STRUCTURE MUST BE INSU-
LATED FOR LOCAL CLI-
MATES.
INTAKE
ST-A1194-18-XO
B
FIGURES O, Q &
DETAIL C
ST-A1194-18-XO
FIGURE K &
DETAILS B & C
3. WALL PENETRATIONS
AND VENT TERMINA-
TIONS MUST BE WITH
2"
PIPE. A MAXIMUM
OF 18" OF 2"
PIPE
IS PERMITTED INSIDE
(BEFORE THE PENE-
TRATION) WHEN
USING 3"
VENT.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

96mdp series

Table of Contents