Panasonic S-36PU1E5A Service Manual page 290

Table of Contents

Advertisement

1
HOW TO PROCESS TUBING
The liquid tubing side is connected by a flare nut, and the gas tubing side is connected by brazing.
Connecting the Refrigerant Tubing
Use of the Flaring Method
Many of conventional split system air conditioners employ the flaring method to connect refrigerant tubes that run
between indoor and outdoor units.
In this method, the copper tubes are flared at each end and connected with flare nuts.
Flaring Procedure with a Flare Tool
Many of conventional split system air conditioners employ the flaring method to connect refrigerant tubes that run
between indoor and outdoor units.
In this method, the copper tubes are flared at each end and connected with flare nuts.
(1) Cut the copper tube to the required length with a tube cutter.
It is recommended to cut approx. 30 – 50 cm longer than the tubing length you estimate.
(2) Remove burrs at each end of the copper tubing with a tube reamer or file.
This process is important and should be done carefully to make a good flare.
Be sure to keep any contaminants (moisture, dirt, metal filings, etc.) from entering the tubing.
NOT E
When reaming, hold the tube end downward and be sure that no copper scraps fall into the tube.
(3) Remove the flare nut from the unit and be sure to mount it on the copper tube.
(4) Make a flare at the end of the copper tube with a flare tool.
NOT E
A good flare should have the following characteristics:
inside surface is glossy and smooth
edge is smooth
tapered sides are of uniform length
Deburring
Before
After
Flare size: A (mm)
Flare nut
Copper
tubing
Flare tool
Copper tubing
(Outer dia.)
ø6.35
ø9.52
ø12.7
ø15.88
1-280
Copper
tubing
Reamer
0
A
–0.4
9.1
13.2
16.6
19.7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents