Figure 2-12 Installing Optional Rps Into The Lockbox Tray - Enterasys 08H20G4-24 Hardware Installation Manual

800-series fast ethernet/gigabit ethernet switches
Table of Contents

Advertisement

Mounting the 8 Port Switches
Figure 2-12
a.
b. Wrap the ends of the strap over the top of the power supply and fasten securely.
2.
Repeat Step 1 with another hook & loop strap to secure the other end of the power supply to
the mounting tray. Final placement of the power supply is shown in
3.
Plug the DC power cord from the power supply into the switch DC power receptacle that is
appropriate for your type of power supply.
2-16 Installation
Installing Optional RPS into the Lockbox Tray
Thread the strap through the mounting tray and around the power supply in the
following order:
(1) Through the bridge anchor on one side of the power supply.
(2) Under the power supply.
(3) Through the bridge anchor on the other side of the power supply.
For the 08A-RPS-24 supply, plug into the 08G20G2-08 receptacle.
For the 08A-RPS-130P supply, plug into the 08G20G2-08P receptacle.
Figure 2-12
on page 2-16.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents