Major Inspection Recommended Spare Parts - GE MS-6001B Maintenance Instructions Manual

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Standard Practices
MS-6001B DLN-1 — Hot Gas Path Inspection Recommended Spare Parts (Cont'd)
BOLTING AND DOWELING ARRANGEMENT (ML1604) (Cont'd)
2.
Nut, Twelve Point (Compressor Discharge Casing to Turbine Casing) Casing)
3.
Bolt, Twelve Point Head (Turbine Casing to Exhaust Frame)
Note: The above quantities cover approximately 20% of the top half casings
bolting requirements only.
CASE MACHINING TURBINE (ML0705) (Turbine Casing Horizontal Flange Hardware)
1.
Stud
2.
Nut, Twelve Point
3.
Bolt, Twelve Point
4.
Bolt, Twelve Point
5.
Stud, Body Bound
6.
Stud
7.
Stud
PLENUM ASSEMBLY, EXHAUST (ML1625)
1.
Bolt, Hex Head (.500-13 x 1.250)
2.
Expansion Joint, Segment (Forward Section)
3.
Gasket, Exhaust Plenum (Forward Section)
DUCT, TRANSITION EXHAUST (MLA042)
**1.
Gasket, Forward Exhaust Transition Piece Removable Panel
THERMOCOUPLES, EXHAUST AND TRIP (ML0623)
1.
Exhaust and Trip Thermocouples
Note: Refer to your Parts Volume of this Service Manual to obtain the proper
drawing and/or part number for the material listed under each ar-
rangement or assembly drawing.
PRIMARY FUEL NOZZLE ASSEMBLY (ML0513)
1.
Tip Assembly (Gas)
SP-50
Inspection and Maintenance — GEK 107048
MS-6001B DLN-1
Major Inspection
Recommended Spare Parts
Recommended
Quantity
*8
*5
*1
*9
*5
*1
*1
*1
*1
28
14
1
1
16
Recommended
Quantity
50

Advertisement

Table of Contents
loading

Table of Contents