Inspection and Maintenance — GEK 107048
Data is to be recorded at 1/4, 1/2, 3/4 and full load. On dual-fuel units, this data should be recorded for both
fuels.
Fuel
HP turbine speed rpm
Fired hours
Manual starts counter
Total starts counter
Fast load start counter
Generator breaker counter
Site altitude, feet
Site barometer, in. Hg
Ambient air temp F
Air after evaporative cooler
Compressor discharge, left
Compressor discharge, right
First-stage forward wheelspace,
inner
First-stage forward wheelspace,
inner
First-stage forward wheelspace,
outer
First-stage forward wheelspace,
outer
MS-6001B DLN-1
Operating Data
(1/4)
(1/2)
— TEMPERATURES — ( F)
Scheduled Turbine Maintenance
(3/4)
Full Load
STM-5