Inspection and Maintenance — GEK 107048
Rail Lifting
Beam
Spreader Bar
Roof Line
Figure HGP-R.6. Turbine Casing Rigged for Reinstallation.
Hot Gas Path Inspection — Reassembly Procedures
Trolley
Hoist
(CG)
Exhaust Stack
Exhaust Transition Piece
Upper Half
Turbine Casing
(In Lift Position)
Exhaust Plenum
HGP-R-15